<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>ArcWest Architects &#124; Denver &#187; Facility Renovation</title>
	<atom:link href="http://www.arcwestarchitects.com/category/facility-renovation/feed/" rel="self" type="application/rss+xml" />
	<link>http://www.arcwestarchitects.com</link>
	<description>Your Architecture Design Team</description>
	<lastBuildDate>Fri, 02 Dec 2011 21:23:42 +0000</lastBuildDate>
	<generator>http://wordpress.org/?v=2.9.2</generator>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
			<item>
		<title>ArcWest &#124; News Brief</title>
		<link>http://www.arcwestarchitects.com/2011/06/30/arcwest-news-brief/</link>
		<comments>http://www.arcwestarchitects.com/2011/06/30/arcwest-news-brief/#comments</comments>
		<pubDate>Thu, 30 Jun 2011 22:03:29 +0000</pubDate>
		<dc:creator>Robin Adams</dc:creator>
				<category><![CDATA[Architecture]]></category>
		<category><![CDATA[Articles]]></category>
		<category><![CDATA[Facility Renovation]]></category>
		<category><![CDATA[Green Design]]></category>
		<category><![CDATA[Planning]]></category>

		<guid isPermaLink="false">http://www.arcwestarchitects.com/?p=1585</guid>
		<description><![CDATA[Robin Adams is certified as a LEED professional. 
ArcWest &#038; Shipley Design has entered a Design-build competition sponsored by AIA Denver and Habitat for Humanity Colorado.
ArcWest is working on a multi-acre site master plan, as well as a smaller manufacturing office remodel.]]></description>
			<content:encoded><![CDATA[<p>ArcWest Architects wanted to take a minute to share a few notable items:</p>
<ul>
<li><a href="http://www.arcwestarchitects.com/wp-content/uploads/2011/06/LEED_GAcmyk.jpg"><img class="size-thumbnail wp-image-1586 alignright" title="Basic CMYK" src="http://www.arcwestarchitects.com/wp-content/uploads/2011/06/LEED_GAcmyk-150x150.jpg" alt="" width="145" height="145" /></a> ArcWest is excited and pleased to announce that  Robin Adams has earned the credential, LEED Green Associate, and is recognized  as a LEED professional with the Green Building Certification Institute.  The partners are committed to continuing education as well as a sustainable approach to building design and construction. This is the first step to expanding our expertise in green building practices and furthering sustainability.  This is paramount to (all of) our futures.</li>
</ul>
<ul>
<li>In partnership with Carl Shipley,  Shipley Design, ArcWest Architects has submitted the entry fee and application to the AIA Denver  for the Blue Spruce home / <a title="AIA Link" href="http://www.aiacolorado.org/aboutus/LocalChapters/AiaDenver/HabitatforHumanityCompetition.aspx" target="_blank">design-build competition</a> for Habitat for Humanity of  Colorado.</li>
</ul>
<ul>
<li>ArcWest is actively working on  a couple of very exciting projects.  At a macro level, one project is a comprehensive multi-acre site and facility master plan addressing immediate building needs while planning for future expansion. In comparison, the other project is on a smaller scale comprised of a 3,200 to 3,600 sf office remodel for a manufacturing facility in metro Denver.  We look forward to sharing more information as each of the projects mature.</li>
</ul>
<p>The partners at ArcWest wishes  everyone a safe and fun 4th of July!</p>
]]></content:encoded>
			<wfw:commentRss>http://www.arcwestarchitects.com/2011/06/30/arcwest-news-brief/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Kind Letter from a Recent Client</title>
		<link>http://www.arcwestarchitects.com/2010/11/08/kind-letter-from-a-recent-client/</link>
		<comments>http://www.arcwestarchitects.com/2010/11/08/kind-letter-from-a-recent-client/#comments</comments>
		<pubDate>Mon, 08 Nov 2010 18:28:17 +0000</pubDate>
		<dc:creator>Robin Adams</dc:creator>
				<category><![CDATA[Architecture]]></category>
		<category><![CDATA[Commercial Architecture]]></category>
		<category><![CDATA[Denver Area]]></category>
		<category><![CDATA[Facility Renovation]]></category>
		<category><![CDATA[Planning]]></category>

		<guid isPermaLink="false">http://www.arcwestarchitects.com/?p=1280</guid>
		<description><![CDATA[One of the best moments during the course of a project is to receive some acknowledgment near the end of the process that the work was completed to the satisfaction of your client, and it was a job well done.
We recently experienced that moment as we just received a kind letter from our past client, [...]]]></description>
			<content:encoded><![CDATA[<p><a href="http://www.arcwestarchitects.com/wp-content/uploads/2007/09/robin_profile_img.jpg"><img class="alignleft size-full wp-image-77" title="Robin P. Adams - Architect" src="http://www.arcwestarchitects.com/wp-content/uploads/2007/09/robin_profile_img.jpg" alt="" width="152" height="98" /></a>One of the best moments during the course of a project is to receive some acknowledgment near the end of the process that the work was completed to the satisfaction of your client, and it was a job well done.</p>
<p>We recently experienced that moment as we just received a kind letter from our past client, Service Uniform.  We want to share that letter with you.  There is no way for us to convey more clearly to prospective clients what value ArcWest can bring to a potential project then letters like this from a satisfied owner.</p>
<p><a href="http://www.arcwestarchitects.com/wp-content/uploads/2010/11/Tschida_Letter-of-Reference.jpg"><img class="alignleft size-thumbnail wp-image-1284" title="Tschida_Letter of Reference" src="http://www.arcwestarchitects.com/wp-content/uploads/2010/11/Tschida_Letter-of-Reference-150x150.jpg" alt="General Manager of Service Uniform" width="150" height="150" /></a></p>
<p>To read the complete letter, please click on <a title="Letter from Service Uniform's General Manager" href="http://www.arcwestarchitects.com/referrals/service-uniform/" target="_blank">Service Uniform.</a></p>
<p>Thank you -</p>
<p>Robin Adams</p>
]]></content:encoded>
			<wfw:commentRss>http://www.arcwestarchitects.com/2010/11/08/kind-letter-from-a-recent-client/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Energy Audits &#124; It&#8217;s Green Biz</title>
		<link>http://www.arcwestarchitects.com/2010/05/18/energy-audits-its-green-biz/</link>
		<comments>http://www.arcwestarchitects.com/2010/05/18/energy-audits-its-green-biz/#comments</comments>
		<pubDate>Tue, 18 May 2010 13:10:41 +0000</pubDate>
		<dc:creator>Robin Adams</dc:creator>
				<category><![CDATA[Facility Renovation]]></category>
		<category><![CDATA[Green Design]]></category>
		<category><![CDATA[Energy Audits]]></category>

		<guid isPermaLink="false">http://www.arcwestarchitects.com/?p=1103</guid>
		<description><![CDATA[An energy audit for an exiting commercial building can translate into significant savings for the building owners.]]></description>
			<content:encoded><![CDATA[<p><img class="alignleft size-full wp-image-77" title="Robin P. Adams - Architect" src="http://www.arcwestarchitects.com/wp-content/uploads/2007/09/robin_profile_img.jpg" alt="Robin P. Adams - Architect" width="193" height="125" /><strong>Arc<span style="color: #ff0000;">West</span></strong> recently read the article “<a title="Link to Green Article" href="http://sanjose.bizjournals.com/sanjose/stories/2010/05/03/smallb1.html" target="_blank">Green business efforts fan growth at Mechanical Air Service</a>” in the San Jose Business Journal which we found both interesting and very applicable in today’s economic environment.</p>
<p>For most commercial building owners and facility executives, the idea of making a capital investment for a new building, or building addition project, is in left field at the moment.  What does make sense is to fine tune the existing building or facility to trim utility bills and recognize savings in their operating budget. Lower energy bills can equate to big savings for commercial building owners.</p>
<p>The approach is straightforward.  Building owner’s can retain a consulting team to perform a comprehensive energy audit going through a commercial building room by room to identify opportunities to reduce energy consumption.  The direction can be as simple as installing more energy efficient lighting for example, to upgrading out of date HVAC systems or adding better control systems.</p>
<p>An advanced course might be to integrate alternative energy systems such as a photovoltaic array (solar panels) or thermal heat transfer systems with the building.  The ROI on investment may take a little longer; however, the property and business can now be marketed as “Green” and environmentally friendly.  The financial return for the later is more challenging to identify directly but remains tangible all the same.</p>
<p><a title="ArcWest's Services - Engineering Coordination" href="httphttp://www.arcwestarchitects.com/services/engineering-coordination/://" target="_blank">ArcWest Architects</a> has teamed with engineering companies recently to assist in performing this sort of energy audit.  Though in most cases the upgrades and modifications required are pure engineering systems, there are architectural impacts that also may need to be addressed. ArcWest’s team will work with an owner to manage the coordination of the building upgrades to insure the implementation process goes smoothly.</p>
<p>For more information on how to approach an energy audit and reduce energy costs, contact us directly at <strong>303.455.7741</strong> or through our <a title="Click here to contact ArcWest Architects" href="http://www.arcwestarchitects.com/contact-us/" target="_blank">website</a>.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.arcwestarchitects.com/2010/05/18/energy-audits-its-green-biz/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Renovate Facilities to Create Green Buildings</title>
		<link>http://www.arcwestarchitects.com/2008/11/07/renovate-facilities-to-create-green-buildings/</link>
		<comments>http://www.arcwestarchitects.com/2008/11/07/renovate-facilities-to-create-green-buildings/#comments</comments>
		<pubDate>Fri, 07 Nov 2008 23:51:09 +0000</pubDate>
		<dc:creator>Robin Adams</dc:creator>
				<category><![CDATA[Articles]]></category>
		<category><![CDATA[Facility Renovation]]></category>
		<category><![CDATA[Green Design]]></category>
		<category><![CDATA[new facility]]></category>
		<category><![CDATA[renovation]]></category>

		<guid isPermaLink="false">http://www.arcwestarchitects.com/?p=466</guid>
		<description><![CDATA[I wanted to share a thought from an article posted on the Greener Buildings website.  The piece reinforces the many options an owner or company has when considering the renovation or construction of a new facilities to integrate &#8220;green&#8221; building practices.  As much as ArcWest would like companies and owners to consider building a brand [...]]]></description>
			<content:encoded><![CDATA[<p>I wanted to share a thought from an article posted on the <a title="Greener Building Practices" href="http://www.greenerbuildings.com/" target="_blank">Greener Buildings</a> website.  The piece reinforces the many options an owner or company has when considering the <strong>renovation</strong> or construction of a <strong>new facilities</strong> to integrate <strong>&#8220;green&#8221; building</strong> practices.  As much as <strong>ArcWest</strong> would like companies and owners to consider building a brand new facility from the ground up, we realize that is not always practical.  For those who want to reduce operating costs, there are simple changes owners can implement to a facility that &#8220;green&#8221; up their buildings and leased spaces.</p>
<p>See excerpt below from the online article &#8220;<a title="Original Aritle" href="http://www.greenerbuildings.com/feature/2008/03/26/sustainable-solutions-the-impact-green-building-movement" target="_blank">Sustainable Solutions: The Impact of the Green Building Movement</a>&#8221; by Wes McDaniel.</p>
<p>A more recent article &#8220;<a title="Green (Ware) House Effect - Area Development Online" href="http://www.areadevelopment.com/energyenvironment/aug08/green-warehouse-logistics-sustainability.shtml" target="_blank">Green (Ware) House Effect</a>&#8220;, by Rick Underwood, shares similar thoughts that affirms the thinking above there are simple considerations and &#8220;easy fixes&#8221; to reducing operating costs for an existing <strong>building or facility</strong>.  Further &#8230;. There are other great points in the article such as the strategic planning for the selected location of a warehouse if properly thought through will reduce costs and reduce the companies carbon footprint.  Being central in your supply chain, receiving and ditribution , makes sense and saves money.</p>
<p>- Robin Adams</p>
<p><strong>&#8220;Seven Simple Ways to Reduce Facility Operating Costs</strong></p>
<ol>
<li>Replace fluorescent 40W-T12 lamps with 32W-T8 lamps and electronic  ballasts.<br />
Not only are T8 lamps with electronic ballasts more  energy-efficient than the standard T12 lamps and ballasts, they also provide  better quality lighting due to a higher color rendering index.</li>
<li>Replace incandescent bulbs with energy-efficient compact fluorescent  lamps.<br />
Compact fluorescent lamps use approximately 1/3 to 1/4 of the wattage  of incandescent bulbs while maintaining the same lighting levels. Furthermore,  compact fluorescents have a lifetime of up to 10,000 hours compared with 1,000  hours for most incandescent bulbs.</li>
<li>Replace incandescent or fluorescent exit sign lights with LEDs.<br />
The law  requires that exit signs run continuously. Light emitting diodes (LEDs) operate  on about 2W compared with 40W incandescent bulbs and 10-15W fluorescent lamps.</li>
<li>Use occupancy sensors in areas where lighting is typically left on when no  one is there.<br />
Occupancy sensors ensure that the lights are turned off when an  area is not occupied. The energy savings from occupancy sensors depends on the  total hours that the lights are normally on and the percentage of hours that  they can be turned off.</li>
<li>Install programmable thermostats.<br />
Programmable thermostats can be used to  schedule the use of your heating, ventilating, and air-conditioning (HVAC)  equipment. They set up or set back temperatures when the facility is not being  used. A reasonable and often-used estimate of savings is 1 percent savings for  each degree of an eight-hour setback.</li>
<li>As motors burn out, replace them with energy-efficient ones.<br />
Standard  motors use a lot of energy to operate and, by increasing efficiency just a few  percentage points, you can save a significant amount of money in the course of a  year, especially if the motor operates for long durations of time.</li>
<li>Instead of rewinding existing motors, replace them with energy-efficient  ones.<br />
Rewinding motors can lower efficiency and increase operating costs.  They also may not last as long as newer motors. Therefore, when the motor is  less than 25 hp, it is generally better to replace the motor with a  high-efficiency equivalent rather than rewind it.&#8221;</li>
</ol>
]]></content:encoded>
			<wfw:commentRss>http://www.arcwestarchitects.com/2008/11/07/renovate-facilities-to-create-green-buildings/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>

